SECONDHAND PLANT TOOLS AND EQUIPMENT
The Best Place To Buy And Sell Your Used Plant - Tools And Equipment
The page you are looking for no longer exists.
Please look at some similar items.
|
Job Lot 16amp and 32amp Leads and Connectors - Northamptonshire
Job Lot of various leads. Happy to split but ideally would like to sell as job lot.2x DAF Army Lorry 4x4 Temporary Roadway - Cardiff
DAF Army 4x4 Lorry x 2 with temporary trackwayEach lorry has 50m x 3m aluminium trackway which rolls out behind the trucks and then gets brought back in.
So you are buying 2 lorries which together make 100m x 3m trackway.
Mercedes Sprinter Pickup With Tail Lift - Lancashire
Sprinter pick upwith drop sites and tail lift
Gross weight 3.5T
First registration June 2017
2143 cc Diesel
12 months MOT
Straight Flight Staircase - London
Straight flight staircase with 1200mm x 1200mm mid landing.1200mm wide closed treads with distinguishable nosings
Table Saw Wadkin Bursgreen 12BGP - Midlands
Table or Bench SawMade by Wadkin Bursgreen
Model 12BGP.
Ser No : 681331.
Angle cutting.
Removed in full working order August 2023 , table rubbed down with oil , for damp protection, barn stored .
3x VT 1 Lighting Towers - Wiltshire
VT 1 Lighting towers.All units start and produce power.
In well used condition.
Stillages, Cages and Frames for Marquee Equipment / Storage Furniture - Kent
Custom and standard sized stillages, cages and frames for marquee equipment, storage furniture etcPrices from £180.00 with fast turnaround. All event fabrication work carried out.
Land Rover Defender 130 2.2 TD DPF Chassis Cab 2dr With Mounted Super Silent 40kW 40kVA Generator - Surrey
A great-looking reliable 2012 Land Rover Defender 4x4 130 TD, which incorporates an on-board 40Kva/40kW super-silent Generator, perfect vehicle for getting power to those inaccessible locations!Used predominantly on feature film productions, hence the low mileage of <39000 miles. Generator run hours is under 3800 hours.
Both Land Rover and Generator have been regularly serviced as per service schedule or sooner (generator every 300 hours or less), lots of service history and paperwork available.
Load more listings